DISTRIBUTION CENTRE PROJECT 

Project Name: Distribution Centre 
Location: County Meath 
Category: Road Construction 
Duration: 3 Months 
Client: Diageo 
Contract Value: €2 million 
Project Detail: 
This Project details two separate contracts that were carried out by A Lynch on behalf of Diageo in Co. Meath. This first package was the Bulk Earthworks Contract, and this was followed by the Civils and Foundations road Construction. 
Key Features 
The excavation of 450,000m³ of peat from site and transportation on public roads 11km to a Deposition Area 
Excavation and deposition of 165,000m³ of unsuitable material 
Cut and Fill of 223,000m³ of suitable material 
15,000m³ of structural concrete including reinforcement, shuttering and finishing. 
4,000m of GRE and 3,000m of GRP Pipework for Oily Water Drainage and Fire Water Mains 